Authority continuity from human approval to resource commitment · Chapter 7 of 10

Worked transaction across two organizations

The scientist approves ten credits at the provider for project P7. The root planning agent may create two specialist agents one level below it. Each worker may post a charge of up to six credits. Both workers reference the same ten-credit allowance. The effect under test is a durable charge in the provider's account history.

  1. Approval. The person confirms the provider, project, ten-credit ceiling, and delegation right. The admission issuer gives the root a receipt. Each worker subsequently receives its own grant and a binding to its own running instance.
  2. First charge. Worker A sends operation 41 for six credits. The provider verifies the receipt, child grant, instance proof, and its own billing policy. The state authority reserves six. Four remain available.
  3. Concurrent charge. Worker B sends a distinct six-credit operation. Its grant is valid, but only four credits remain available. Its charge cannot commit. If the two requests arrive together, either worker can win the reservation.
  4. Lost reply. The provider durably posts operation 41 and its reply is lost. Worker A retries with fresh proof and the same operation and terms. The provider finds the original row, issues a response linked to the retry and original outcome, and settles the six units once. One six-credit charge appears in the account history.
  5. Changed terms. An otherwise authorized retry of operation 41 for five credits conflicts with the stored six-credit intent. A second charge receives no authorization under that identifier.
  6. Revocation and restore. The state authority revokes the root. Once the enforcement bound expires, neither child can post another charge. Restoring a copy taken before operation 41 places the affected services on hold until they recover the recorded charge, spent allowance, revocation, and latest checkpoint.